Sweetwater Road
Separated Bikeway

National City, California

Project summary

Capuzzi Consulting Group staff served as Project Manager (Matt Capuzzi) and lead Project Engineer (Forrest Baker) for all phases of this project (PE, CEQA, Caltrans Permitting, PS&E, and Design Support During Construction). The project implements separated bike lanes on Sweetwater Road from N. 2nd Avenue to Plaza Bonita Road and on Plaza Bonita Road from Sweetwater Road to the Sweetwater River Trail. The project crosses through Caltrans right-of-way twice, at I-805 and at SR-54.  An innovative Pedestrian Hybrid Beacon was implemented at the intersection of Orange Street and Sweetwater Road to connect the two-way separated bike lanes east of Orange Street to the one-way separated bike lanes west of Orange Avenue. The project also includes a bus island to eliminate bus/bike conflicts EB, just east of Orange Street.

Key features

  • Separated Bike Lanes
  • Pedestrian Hybrid Beacon
  • Stormwater BMPS
  • Bus Island
Website Designed & Built In Collaboration With
BeeLeaf Creative
© 2024 Capuzzi Consulting Group, Inc. All Rights Reserved
Privacy PolicyTerms & ConditionsCookies Policy